Perhitungan Pile Cap Excel [cracked] Today

): Ditentukan berdasarkan momen yang bekerja dan batasan rasio tulangan minimum ( ρminrho sub m i n end-sub Rumus Dasar yang Digunakan di Excel

Critical section at distance d (effective depth) from column face. V_u = sum of piles outside that section. φ V_c = 0.75 * (1/6 √(f'c)) * b_w * d perhitungan pile cap excel

Critical section at d/2 from column face. V_u = P_u - (pressure on the area within perimeter). φ V_c = 0.75 * (1/3 √(f'c)) * b_o * d ): Ditentukan berdasarkan momen yang bekerja dan batasan

A pile cap (also known as a poer in Indonesia) is a reinforced concrete block that consolidates a group of piles and distributes loads from columns to the deep foundation. In modern structural engineering, Microsoft Excel is the primary tool for these calculations due to its ability to handle iterative design checks such as punching shear, one-way shear, and flexure reinforcement. Core Functions of a Pile Cap V_u = P_u - (pressure on the area within perimeter)

A well-structured sheet typically includes:

Pile cap adalah struktur beton bertulang yang tebal (biasanya berbentuk slab) yang diletakkan di atas sekelompok tiang pancang. Fungsinya bukan sekadar "topi" bagi tiang, melainkan media transmisi beban yang kompleks.

| Cell | Parameter | Unit | Example Value | | :--- | :--- | :--- | :--- | | B2 | Column width (bx) | mm | 500 | | B3 | Column height (by) | mm | 500 | | B4 | Pile diameter (D) | mm | 400 | | B5 | Concrete strength (f'c) | MPa | 25 | | B6 | Steel yield (fy) | MPa | 420 | | B7 | Axial load (Pu) | kN | 2500 | | B8 | Moment Mx | kNm | 120 | | B9 | Moment My | kNm | 80 | | B10 | Pile cap thickness (h) | mm | 800 | | B11 | Concrete cover | mm | 75 | | B12 | Pile spacing (s) | mm | =3*B4 |